5000 kg high pressure steam gas fired boiler for sale

5000 kg high pressure steam gas fired boiler for sale

Several problems into a coal-fired 5000 kg high pressure steam fired boiler for sale fuel gas boiler fired boilers changed several issues should be noted that the fuel gas boiler: fuel oil (l) high temperature corrosion of the fuel used in the boiler, containing an organic salt of a metal element as sodium, vanadium class, after combustion of the low melting point eutectic oxide crystals, generally of about 600 ℃, or even lower. These oxides sublimation at a high temperature furnace, then condensed in a lower relative temperature of the heated surface to form a high temperature corrosive fouling. Is characterized by high temperature corrosion: the metal began to appear at temperatures in excess of 580-620 deg.] C, the higher the temperature, the faster the etching. High temperature corrosion measures to prevent: l) the use of additives. Mainly magnesium, calcium oxide, hydroxide or dolomite (CaC03, MgCO3) and the like, these additives can generate a high melting point compound with the component acting in a high temperature fouling, the fouling becomes loose and shape, so as to avoid or mitigate high temperature corrosion. 2) use high temperature materials with good corrosion resistance, high temperature corrosion resistant chromium steel is better than the nickel-chromium steel. 3) coated with a protective film. Susceptible to corrosion in high temperature heating surface ceramic surface coating, a silicon carbide or silicon nitride special coatings, the heated surface may be aluminized other treatment to improve its high temperature resistance. 3) coated with a protective film. Susceptible to corrosion in high temperature heating surface and other surface-coated ceramics, silicon carbide, silicon nitride, or special coatings, the heated surface may be aluminized other treatment to improve its high temperature performance rot cloud. (2) low temperature corrosion in fuel sulfur generated during the combustion S02, since the fouling atomic oxygen present in the furnace and the convection heating surface and catalytic oxide film, SO2 is further oxidized to S03. S03 and H2S04 vapor in flue gas generated in conjunction with, the dew point of the flue gas containing the sulfuric acid vapor is greatly increased, when heated wall temperature below the dew point of sulfuric acid vapor will condense on the walls, and corrosion of the metal wall. Usually low temperature corrosion It occurs at the end of the air preheater of the boiler. Thus when burning high sulfur fuel, care must be taken to prevent low temperature corrosion. Prevent low temperature corrosion measures are: 1) low oxygen combustion. When the excess air at the outlet of the furnace lag coefficient down to 1.10 or less, for sulfur of the fuel oil used, the dew point of the flue gas will be significantly decreased, so as to avoid or mitigate low temperature corrosion. 2) use of additives. Sprayed into the furnace or flue additive in the curb generation of SO3 and to reduce the flue gas dew point temperature. Common additives solid (dolomite, limestone, magnesium oxide, and some special compound), the liquid (aqueous magnesium chloride solution, some oil soluble magnesium, calcium, zinc naphthenate compound) and a gas (ammonia gas, ammonia, three different ring) three categories. 3) raising the thermal wall temperature, so that it is higher than the dew point temperature of flue gas. Commonly used methods are: hot air recirculation inlet temperature of the air preheater increase; the installation of the heater core, air is heated by steam, a low temperature air preheater horizontal structure, the level of a horizontal pipe line is arranged an air preheater , the air flow in the pipe, the pipe between the smoke flow, erosion due to the lateral wall of the flue gas, the flue gas side heat transfer coefficient is increased to increase the wall temperature, more generally vertical wall temperature of the air preheater increase 20 ~ 25 ℃. 4) corrosion-resistant materials or corrosion resistant coating materials include glass, ceramics and the like; an anti-corrosion coating and had tried to enamel-coated surfaces like special steel anticorrosion paint. 5) timely sootblowing operation, and therefore should be a reasonable arrangement sootblowers. Fire and explosion of fuel failure (3) heating surface of the tail or incomplete combustion of atomized droplets gather in the tail of the heating surface, when it reaches ignition or explosion conditions, i.e., ignition and explosion may occur. The tail heating surface fouling aggravated by the possibility of aggregation of the oil droplets. Therefore, when coal-fired boilers into oil-fired boiler, burner should be correct and rational selection and delivery, and strictly develop from the induced draft fan. Rules and procedures for shutdown and normal operation to ensure good fuel atomization, with the wind reasonable. At each of the heating surface is arranged to be reasonable sootblowers. (4) determining the dew point temperature of flue gas is determined dew-point temperature of the flue gas has practical significance for the design and operation of flue gas dew point temperature factors influence mainly sulfur fuel ink, excess air coefficient, water vapor in the flue the amount of sulfur / cement ratio and combustion.

Fast 5000 kg high pressure steam fired boiler for sale is a very trustworthy business, whether it is the beginning of cooperation or boiler put into operation, such as a party soon have maintained cooperative attitude, patience, careful. To ensure long-term stability of the latter part of the boiler operation, fast boiler technician fireman's gave us a free people to do the training, precautions and reduce the accident rate method full guidance boiler operation. --customer feedback

Gas 5000 kg high pressure steam fired boiler for sale precautions required during installation methods, or steps :( a) a foundation base of the boiler should be provided is determined according to the local soil, manufacturers design reference by the civil sector again. After reaching the base strength boiler, the boiler should drawings inspection and acceptance, and to draw the whole boiler three reference lines: a, longitudinal reference line - drum center or the center of the combustion apparatus. b, lateral reference line - the center of the front axle or chain grate slag centerline of the machine. C, elevation reference line - can be selected from a number of locations about four weeks, respectively, on the basis of the marking, the relative offset between the markers should not exceed 1mm. Furnace in place. After assembly the lower part of the boiler in place first, then the upper assembly large, the upper and lower portions need to find a combination of two positive pads firmly, should be both inside and outside the two casting. Installation location and size deviation test methods according to GB50273 "boiler installation engineering construction and acceptance" implementation. (B) lifting the boiler, during lifting, should be suspended on a lifting lug drum boiler ready large, the boiler on a foundation base coincides with the pre-drawn reference line. The longitudinal centerline of the boiler and the foundation, the deviation is not more than 3 mm, and the inclination with the center line of the drum hammer correction, allowing the central drum inclination is not larger than 5 mm, otherwise use horns foundation base and the junction pad level. Maximum level (c) Installation of boiler network (1), water supply conduit installation requirements typically require as backup pool below the normal water level line of the boiler, so as not to shutdown, boiler feedwater flowing into a large number of drainage caused to start the next . At the outlet of the tank (i.e., an inlet feed line) should be installed wire screen. (2), a main steam line installation requires the main steam lead pipe straight run section should be more than 0.5 m, the bending radius should be 4-5 times the diameter of the pipe, the trap should be fitted at the lowest line in order to prevent water hammer pipe, while to be reliable insulation. (3), the safety valve should be installed in the valve installation requirements after the hydrostatic test, the safety valve shall be fitted exhaust pipe, the exhaust pipe of the safety guide outside the boiler house, allowed valving the exhaust pipe. (4), mounting a lower water table level table downcomer must access a safe place, Hancock rotating flexible water table, not leaking, water table must be installed to the lighting device, easy to observe. (5), a pressure gauge mounting means so that when the scale gauge vertical plates, should be painted red gauge scale to show the maximum allowable pressure boiler, rotating flexible plug gauge, not leaking, water flow, pressure gauges insulation prohibited. (Iv) the boiler chimney installation requirements, when lifting the chimney, the chimney should be straight, horizontal direction lead length should not be too long, generally less than 5 meters, the height of the chimney should comply with relevant national standards. To add chimney rain cap, the weight of the chimney should not fall directly on the boiler chimney take over the host. Installation (e) combustion system: 1, according to the combustion system of FIG power line control circuit, a control signal line and the control line is electrically connected, the program should be installed reliable ignition and flame failure protection devices. Combustion process controller provides a separate set of contact start-stop control. May be formulated in a variety of burner start-stop loop cascade control relay 10A is a fuse, relay start-stop control stops the control terminal may be connected to the burner, may directly control the power of the burner. Both constant pressure sensor, water power, fuel, gas pressure set value is detected after the automatic controller opens. Time pressure sensor, water supply, oil, gas, and their detection circuit, alarm and found the problem immediately shutdown flame protection, the controller automatically displays the point of failure, an alarm sounds machine.

Main contents of 5000 kg high pressure steam fired boiler for sale energy efficiency test:

1. Boiler thermal efficiency test: a) determination of boiler evaporation; b) boiler excess air coefficient detection; c) exhaust smoke temperature detection; d) fuel combustion efficiency test; e) boiler thermal efficiency test; f) fuel consumption; g) Steam to coal ratio.

2. Boiler new product stereotyped energy efficiency test: Determine whether the boiler thermal performance indicators are consistent with the design and determine the operation mode of the equipment. Such as boiler evaporation, boiler thermal efficiency, combustion efficiency, various heat losses and so on.

3. Boiler operation adjustment test: Determine the most economical operation mode of the boiler and identify defects in the boiler operation. Such as boiler maximum load, boiler minimum load, fuel requirements, economic load, reasonable exhaust gas temperature, optimum wind coal ratio, excess air ratio, secondary air ratio and so on.

4. Comparative test of thermal performance before and after boiler reform: changes in evaporation, effects of combustion, thermal efficiency of boilers, etc.

5, fuel industry analysis, elemental analysis: to judge the quality of oil, gas and other fuels, easy for enterprises to control the quality of fuel into the plant.

6, water quality testing, scale analysis: determine the quality of water, control the boiler water indicators to prevent boiler fouling.

oil steam boilers 5000kg - darbouche-elberskirch.de

oil 5000kg steam boiler - villamaruzza. fuel oil 5000kg steam boiler Gas fired boiler for sale. Steam Generator Boilers Steam Generator Boilers Compact Steam Boilers 5,000 kg/h steam at 1 barg all the way up to 190 barg for natural gas, light fuel oil, heavy fuel oil and High Standard 5000kg gas oil steam boiler

Read More

Products - MIURA BOILER

2020-4-9 · LX Gas/ Low NOx Series Low and High Pressure Steam Boiler. Miuras Ultra Low NOx Steam Generator uses the most advanced technology. The flat shaped burner and the rectangular shaped boiler vessel are uniquely designed for the reliable low NOx. 5 minutes from cold start to full pressure. Ultra Low NOx gas burner with Quenched flame.

Read More

5000 kg/hr gas fired steam boiler used in industry

2017-9-22 · exhaust gas-fired boiler, with a 1,200-6,500 kg/h capacity of the oil-fired to 5,000 kg/h from the exhaust gas section. into one reliable production of steam both during voyage and port stay. fully integrated, and standard burners cannot be used for this boiler.

Read More

5000kg hr diesel fired vapor boiler - WHGLA

Supermarket Fire Tube Boiler Price In China. China Gas or Oil Boiler alog of 1 to 20 Ton/Hour 13 Bar Pressure Industrial Fire Tube Natural Gas Diesel Heavy Oil Fired Steam Boiler for Sale, Diesel Fired Water Boiler From 300kw to 7000kw Thermal Power provided by China manufacturer Henan Yuanda Boiler Corporation Ltd., page1.

Read More

oil steam boiler 5000kg_ZOZEN BOILER_China boiler

Factory price hot sale Oil Gas Steam Boiler Water Boiler. Oil or gas fired horizonal type steam boiler. Pressure: Low Pressure. Usage: Industrial. Style: Horizontal. Chat on Line. 4ton 5000kg heavy and gas oil burner steam boiler supplier seller.

Read More

Steam Boiler Biomass 5000kg - neurodowo2012.de

5000kg Oil Gas Steam Boiler Wholesale Boiler. 5000Kg H Gas Fired 5 Ton Steam Boiler Low Cost . Coal fired steam boiler is horizontal style, low pressure, single drum, fire and water tube structure, chain grate steam boiler WNS series oil gas fired boiler is a safe and high efficiency (98%) heating equipment with high automation, fast assemble

Read More

industrial steam boiler gas fired - ferienhaus-rosenow.de

Industrial Steam Boiler - More - Zhong Ding Boiler . Industrial steam boiler is widely used for different industrial productions for drying, steaming, sterilizing, dying, reacting, etc The fuel could be oil, gas, coal, biomass, electric, etc Zhongding Boiler concentrates on the invention of high-tech environmental protect and energy saving industrial steam boilers, including circulating

Read More

1,500 - 6,000 MBTU & 7,500-8,000 Low Water Volume

2018-8-5 · The Model 5 Commercial Watertube Boiler product line is used for low and high pressure steam applications. Sizes a Model M5P-700-2500-150 boiler designates a gas-fired, 2,500,000 Btu/hr, 150 psig, steam boiler. Model 5 1500 - 6000 MBTU/hr 5000 5000 4000 119 4124 4700 6000 6000 4800 143 4949 5400 8000 LWV 8000 6320 194 6516 6200

Read More

5000 kg hr oil fired steam boiler widely used in

Boiler name: 5000 kg hr oil fired steam boiler widely used in Montenegro. a grade boiler manufacturer supply gas heavy oil boiler for sale best price in India; Product and Process Design Principles - Seider further improvement of beat absorption technology and water tube equipped new type fin for pressure loss reduce in combustion gas

Read More

5000 Heating Surface Of Boiler - lodgings-hamburg.de

5000 kg h steam boiler - dsmdcollege.org.in. Fully Water cooled with high heating surface and high boiler efficiency for low and high calorific coal.5000kg hr lpg fired steam boiler WNS OIL GAS 5000kg Hr Natural Gas Fired Boiler, 5000kg Hr . 5000kg Hr Natural Gas Fired Boiler, Wholesale Various High Quality 5000kg Hr Natural Gas .

Read More

5000Kg Steam Electric Boiler Price - shg-niere-im

5000kg hr low pressure steam boiler. 5000kg coal fired steam boiler for sale - / h biomass boiler wood steam generator green boiler 1500 2000 2500 3000 4000 5000 6000 7000 8000 10000 12000 14000 16000 18000 rating in LB/HR and have used the following; boiler capacity -

Read More

China High Quality Alibaba 1ton to 10ton Steam

Steam Boiler, Oil Steam Boiler, Gas Steam Boiler manufacturer / supplier in China, offering High Quality Alibaba 1ton to 10ton Steam Capacity Oil Fired Boiler, Diesel Oil Boilers, Wns Gas Oil Fired Freez Dryer Steam Boiler, Electrical Water Heating Boiler for Sale and so on.

Read More

5000Kg Steam Boiler For Sale - gaestezimmer

5000 kg h steam boiler - ferienhaus-am . 5000kg steam boiler for sale - pearlresort.co.in. 5000kg h oil boiler. industrial 5000kg boiler Gas Central Heating Boiler For Sale WNS new-tech oil/gas/lpg/lng Fired 5t/h steam boiler/5000kg/h forbes marshall steam boilers industrial boiler Forbes Marshall is a trusted partner in steam engineering control instrumentation.

Read More

5000kg industrial vertical steam boiler

5000kg hr wns industrial horizontal steam boil. 5000kg steam boiler - kuurnsezichten.be. One is steam boiler, and the other is hot water boiler. 5000kg steam gas boiler 5000kg gas feul steam boiler industrial boiler for sale. 5000kg/hr gas fired steam boiler in Bangladesh. how much natural gas required for 1tph boilerindustrial 5000kg steam boiler Industrial Steam BoilersKey words

Read More

5000kg hr low pressure steam boiler - duesentrieb

5000kg steam boiler with 15 bar pressure oil fired boile. Design pressure: 12 or 15 bar Steam Production: 350 ÷ 5000 kg/h Efficiency: 90% Steam boiler three pass reverse flame wet back firetube boiler complying . Gas boilers All industrial manufacturers Videos DirectIndustry Two . Get a quote

Read More